OHS Act 85/1993 · MHSA 29/1996

No risk assessment, no work.

Aleph Safe writes the method statement, risk assessment and safe work procedure your job needs, under the OHS Act or the MHSA. Built on 2,000+ real South African precedents, not a folder of templates.

14 days free, 5 documents, no card. Then from R299 a month. Viewers never cost you a seat.

Risk assessment RA-2026-014 · Rev 0 · Draft

Hazard 01 / 06

Fall from height

Steel erection at roof level

Inherent
L4 × S5 Extreme
Controls
Fall protection plan, double-lanyard harness, edge barricades and a rescue plan
Residual
L1 × S5 Medium

Construction Regulations 2014, reg. 10

Competent person: signature pending Ready for sign-off
Hazards in this assessment
  1. Fall from height (Steel erection at roof level): inherent risk Extreme; controls: Fall protection plan, double-lanyard harness, edge barricades and a rescue plan; residual risk Medium. Construction Regulations 2014, reg. 10
  2. Trench collapse (Excavation for stormwater, 2.4 m deep): inherent risk High; controls: Shoring to design, daily inspection by a competent person, spoil kept 1 m back from the edge; residual risk Medium. Construction Regulations 2014, reg. 13
  3. Struck by a suspended load (Mobile crane lift of roof trusses): inherent risk High; controls: Lift plan, certified operator and rigger, exclusion zone under the load, tag lines; residual risk Medium. Driven Machinery Regulations, 2015
  4. Fire from hot work (Cutting and welding near the fuel store): inherent risk High; controls: Hot work permit, combustibles cleared, fire watch for 30 minutes after, extinguisher at the point of work; residual risk Low. General Safety Regulations, reg. 9
  5. Noise-induced hearing loss (Concrete cutting and breaking): inherent risk High; controls: Hearing protection zone, rated hearing protection, task rotation, audiometric screening; residual risk Medium. Noise Exposure Regulations, 2024
  6. Electric shock (Temporary supply tie-in at the distribution board): inherent risk High; controls: Isolation and lockout by an authorised person, test before touch, earth leakage protection on all temporary supply; residual risk Medium. Electrical Installation Regulations, 2009

Minutes

Not days, per document

3 documents

MS, RA and SWP, in sequence

Two Acts

The OHS Act and the MHSA

2,000+

South African precedents

How it works

AS-PRC-001 · Rev 3

From brief to a reviewable draft

Three steps, and the last one stays yours. Every document is a draft until a competent person signs it.

Step 01

Describe the site and the task

Enter your project details, site address, scope of work and type of task. The more context you provide, the more precise the output.

Step 02

Generate a site-specific draft

Aleph builds the document from 2,000+ real South African safety precedents. No guesswork, and nothing borrowed from another country’s rules.

Step 03

Review, sign off, submit

Download as XLSX or DOCX. A competent person reviews and signs it. The platform does not replace the appointment.

Three documents that agree

Generated in sequence, so they never disagree.

The risk assessment is drawn from your approved method statement, and the safe work procedure from both. That is the first thing a reviewer checks.

  • MS · Method statement

    The sequence of the work

    Activity by activity: the plant and PPE involved, the legal appointments the task requires, the controls, and the emergency procedures.

  • RA · Risk assessment

    Drawn from the method statement

    Hazards rated before and after controls on a five by five matrix. Job/task, issue-based and baseline assessments.

  • SWP · Safe work procedure

    Drawn from both

    Step-by-step execution for the people doing the work, with the legislative references that apply on that site.

By industry

Written to the Act that applies on your site

Choose the legislation per project. The document follows it, down to the clause.

Written to the OHS Act and the Construction Regulations 2014

Method statements, HIRA and safe work procedures for principal contractors and site access, not an overseas template with a South African logo. Risk assessments are aligned to Construction Regulation 9.

Construction documents

  1. OHS Act 85/1993The Act every construction document on the site answers to.
  2. CR 2014 · reg. 9Risk assessment: job/task, issue-based and baseline, with inherent and residual ratings.
  3. Safety fileNumbered, revision-controlled documents a principal contractor can review and a CHSO can induct against.
  4. AppointmentsThe legal appointments the task requires, named in the method statement.

Why Aleph Safe

Not a template tool. A compliance engine.

Built from 2,000+ real South African safety precedents across construction, mining and industrial sectors.

Written for the job in front of you

Give it the scope of work. It returns a full step-by-step sequence, the legal appointments that task requires, the plant and PPE involved, and the emergency procedures.

Built to be checked

Every document carries a number, a revision and an approval trail, so when a client’s safety officer asks who signed it and when, the answer is in the document.

Three documents that agree

Generated in sequence from one scope, so the risk assessment matches the method statement and the SWP matches both.

Both Acts, one platform

Construction, mining, agriculture, manufacturing and SHEQ consulting. The OHS Act and the MHSA, chosen per project.

Viewers never cost a seat

You pay for the people who write documents. Clients, reviewers and directors read for free, on every plan.

Your documents stay yours

Stored privately, isolated by row-level security in the database, and encrypted in transit and at rest. Nothing you write is used to train external AI models.

Aleph Control

Safe writes the documentation. Control keeps the record.

Incidents, man-hours, training, PPE, equipment, permits and contractors in one dashboard, with LTIFR, TRIFR and AIFR calculated for you. Run both, and every document you generate for a project appears against that project in Aleph Control.

Project scorecardRate base 200,000 h
Hours worked
412,560
LTIFR
0.48
TRIFR
1.45
AIFR
4.36
LTI-free days
214

LTIFR, rolling 12 months1.21 → 0.48

LTIFR = (lost time injuries ÷ hours worked) × 200,000

Example figures: 1 LTI, 3 recordable and 9 total injuries over 412,560 hours.

Pricing

Simple, transparent pricing

Every plan starts with a 14-day free trial and includes all three document types, secure storage and email support. The price you see is the price you pay.

  • Basic

    Independent contractors

    R299 a month

    R2,990 a year

    1 author seat · 20 documents a month · 3 projects

    Works out at R249.17 a month

    • All three document types
    • 20 documents a month
    • 1 author seat
    • Up to 3 projects
    • Unlimited free viewers
    • Extra author seats R99 a month
    Start free trial
  • Consultant PRO

    SHEQ consultants

    R1,499 a month

    R14,990 a year

    8 author seats · 150 documents a month · unlimited projects

    Works out at R1,249.17 a month

    • Everything in Professional
    • 150 documents a month
    • 8 author seats
    • A separate project per client
    • Unlimited projects
    • Extra author seats R79 a month
    Start free trial
  • Enterprise

    Large organisations

    R4,500 a month

    R45,000 a year

    20 author seats · 450 documents a month · unlimited projects

    Works out at R3,750 a month

    • Everything in Consultant PRO
    • 450 documents a month
    • 20 author seats
    • Onboarding assistance
    • Extra author seats R69 a month
    Contact us

You pay only for the people who write documents. Viewers are free and unlimited on every plan. Compare plans for both products.

Who builds Aleph Safe

Built by people who have written the safety file themselves.

Aleph Safe is operated by Aleph Safe (Pty) Ltd and built by Aleph Technologies (Pty) Ltd, both part of the Aleph group. Behind the platform is over 20 years of safety management practice across 19 countries, including major mining operations and large OHS construction projects in South Africa.

About Aleph

20+

Years of South African SHEQ practice

19

Countries worked in

OHS Act

85 of 1993

MHSA

29 of 1996

Frequently asked questions

Common questions

Something not covered here? Ask us directly.

Are documents written to the OHS Act?

Documents are written to the OHS Act 85 of 1993, the Construction Regulations 2014 and the MHSA 29 of 1996, from 2,000+ South African compliance precedents. They are issued as drafts. A competent person must sign them before they carry any authority.

What types of documents can I generate?

Method statements, risk assessments and safe work procedures. Additional document types are in development.

Does this replace a competent person?

No. You still need to know the job, and a competent person must sign every document. The platform produces the draft, the numbering and the approval trail. It does not replace the appointment.

Is my data secure?

Documents are stored privately. Every table is protected by row-level security, so a company can only ever read its own records, and data is encrypted in transit and at rest. No document data is used to train external AI models.

Can I cancel at any time?

Yes. Cancel from your account settings. There is no lock-in contract, and if Aleph is not right for you, email us within 14 days of your first payment for a full refund.

What happens when my trial ends?

The trial runs for 14 days with 5 documents and needs no card. When it ends your account becomes read-only: nothing is owed, nothing is charged and nothing is deleted. Choose a plan, from R299 a month, to create or change documents again.

Start with the job in front of you.

14 days free, 5 documents, no card. If it is not doing the job, walk away.